How Long To Put A Roof On A House is a question homeowners often ask after scheduling a replacement or considering DIY. From the ground, roofing looks fastโbut the timeline depends on roof size, design, materials, weather, and crew experience. This guide breaks down the real schedule so you can plan without surprises.

What Is the Typical Timeframe to Install a New Roof?
For a standard 1,500โ2,000 sq ft home with asphalt shingles, professionals usually finish in 1 to 2 days under ideal conditions.
Read too: How To Replace A Mobile Home Roof: Step-by-Step Guide for Homeowners
For background on roof structures and materials, see:
https://en.wikipedia.org/wiki/Roof
This assumes:
- Clear weather
- Simple roof layout
- No structural wood damage
- A 4โ6 person crew
Timeline by Roofing Material
Different materials change the pace because of weight, handling, and precision needs.
| Roofing Material | Time Required (Pro Crew) |
|---|---|
| Asphalt shingles | 1โ2 days |
| Metal panels | 2โ4 days |
| Wood shakes | 3โ5 days |
| Concrete/clay tiles | 5โ8 days |
| Slate | 6โ10 days |
Heavier materials demand slower, careful placement.
How Roof Size Impacts Installation Time
| Roof Area | Estimated Duration |
|---|---|
| 1,000 sq ft | 1 day |
| 1,500 sq ft | 1โ2 days |
| 2,500 sq ft | 2โ3 days |
| 4,000+ sq ft | 3โ5 days |
Bigger roofs require more time not only for installation but also for moving materials.
Why Roof Design and Pitch Matter
A simple gable roof is quick. Complex designs slow progress significantly.
Design Features That Add Time
- Valleys and dormers
- Skylights and chimneys
- Steep slopes (above 8:12 pitch)
- Multiple roof levels
- Two or more old shingle layers
Each feature can add half a day or more.
Step-by-Step: What Roofers Do Each Day
Day 1 โ Tear-Off and Prep
- Remove old shingles
- Inspect and replace damaged decking
- Install drip edge
Day 2 โ Underlayment and Shingles
- Apply ice & water shield
- Lay synthetic underlayment
- Install starter shingles and main rows
Day 3 โ Flashing, Ridge, and Cleanup (if needed)
- Flash around vents and chimneys
- Install ridge caps and vents
- Magnetic nail sweep and debris removal
Smaller homes often compress this into 1โ2 days.
Weather: The Biggest Cause of Delay
| Weather Issue | Effect on Project |
|---|---|
| Rain | Stops work completely |
| High wind | Unsafe for carrying shingles |
| Extreme heat | Slower pace, more breaks |
| Cold (<40ยฐF) | Shingles become brittle |
A planned 2-day project can stretch to 4 days with poor weather.
DIY Timeline vs Professional Timeline
| Installer | Time Needed |
|---|---|
| Professional crew | 1โ2 days |
| Experienced DIYer | 4โ6 days |
| Beginner DIYer | 7โ10 days |
DIY projects take longer due to learning curve and rest periods.
Hidden Delays Most Homeowners Donโt Expect
- Rotten plywood discovered after tear-off
- Incorrect material delivery
- Waiting for permit inspection
- Dumpster arrival delays
- Limited driveway access
Deck repair alone can add a full extra day.
How Many Workers Speed Up the Job?
A typical roofing team includes:
- 1 project lead
- 3โ5 installers
- 1 ground cleanup worker
Team coordination is why professionals move quickly and safely.
How to Prepare Your Home to Avoid Delays
Simple Preparation Checklist
- Clear driveway for material drop
- Remove cars from garage
- Trim overhanging branches
- Provide access to power outlets
- Inform neighbors about noise
These steps prevent unnecessary pauses.
Signs the Roofing Job Is Taking Too Long
- Minimal progress after the first day
- Workers leaving early
- Materials unused on the ground
- Lack of visible coordination
A basic asphalt roof should show rapid progress within hours.
FAQ: How Long To Put A Roof On A House
Q1: Can roofing really be done in one day?
Yes, for small, simple roofs with a full crew and good weather.
Q2: Why do tile and slate roofs take much longer?
They are heavier and require precise, slower installation.
Q3: Is tear-off the longest part?
No. A crew can tear off a roof in a few hours.
Q4: Should I stay home during installation?
Yes, in case decisions or questions arise.
Q5: What happens if it rains during the job?
Roofers tarp exposed areas to prevent water entry.
Q6: When can I use my driveway again?
Usually the same evening after cleanup.
Conclusion
So, How Long To Put A Roof On A House? In most cases, just 1โ2 days for asphalt shingles with a professional crew. But roof size, complexity, material, and weather can extend the timeline. Understanding these variables helps you plan realistically and avoid frustration. If this guide helped you prepare, share it with other homeowners planning a roof project.